Ms. Brown was responsible for performing a complete hydrologic and hydraulic analysis for the project. Included in the predesign was a development of alternatives including cost analysis for conveyance of approximately 4000 cfs of flood flow through the project area.
Recent Posts
- 2016 – Railroad Pass Travel Center – Henderson/Boulder City, Nevada
- 2014 – Love’s RV Storage Site – North Las Vegas, Nevada
- 2014 – APEX Commercial Center North (ACCN)- North Las Vegas, Nevada
- 2012 – Technical Drainage Study for Nextera Energy – Mountain View Solar Energy Project
- 2012 – Technical Drainage Study for Mountain View Industrial Park – Phased Grading of the West Detention Basin with Shadow Study
Recent Comments