Ms. Brown was responsible for preparation of the Master Drainage Study and drainage design drawings for the site, which included an onsite basin of over 450 acres, varying in land usage from commercial to multi- and single-family residential. Design included a storm drain collection system and pipeline.
Recent Posts
- 2016 – Railroad Pass Travel Center – Henderson/Boulder City, Nevada
- 2014 – Love’s RV Storage Site – North Las Vegas, Nevada
- 2014 – APEX Commercial Center North (ACCN)- North Las Vegas, Nevada
- 2012 – Technical Drainage Study for Nextera Energy – Mountain View Solar Energy Project
- 2012 – Technical Drainage Study for Mountain View Industrial Park – Phased Grading of the West Detention Basin with Shadow Study
Recent Comments