Clark County, Nevada. Ms. Brown was responsible for the preparation of the Technical Drainage Study and the LOMR for the project, which was a 20-acre parcel planned for 157 single-family residential lots. The site is located just downstream of the Blue Diamond Detention Basin, a regional drainage facility, that greatly reduces the flow in the Blue Diamond Wash and reduces the flood zone impacting the site.
Recent Posts
- 2016 – Railroad Pass Travel Center – Henderson/Boulder City, Nevada
- 2014 – Love’s RV Storage Site – North Las Vegas, Nevada
- 2014 – APEX Commercial Center North (ACCN)- North Las Vegas, Nevada
- 2012 – Technical Drainage Study for Nextera Energy – Mountain View Solar Energy Project
- 2012 – Technical Drainage Study for Mountain View Industrial Park – Phased Grading of the West Detention Basin with Shadow Study
Recent Comments