Boulder City, Nevada. Ms. Brown was responsible for the preparation of the LOMR for the Solar Energy Plant, which included re-mapping 40+ acres of solar field area that had once been located within a Special Flood Hazard Zone A.
2011 – Letter of Map Revision (LOMR) for Copper Mountain Solar Energy Plant
by admin | Sep 16, 2020 | Projects | 0 comments
Recent Comments