Boulder City, Nevada. Ms. Brown was responsible for the preparation of the technical drainage study for this 1000+ acre solar field site, which implemented large quantities of photovoltaic (PV) panels for the generation of electricity. The drainage design for the site included large earthen channels that operate to convey over 500 cubic feet per second (cfs) of runoff flow approaching the site, redirecting it around the site for discharge into historical flow paths downstream of the solar fields