Ms Brown prepared the technical drainage study for the 10-acre site, which was planned for development of paved/covered storage areas for RV vehicles. The site is located in an active alluvial floodplain, which required major flood control facilies to allow the civil design. The flood control facilities included onsite detention, and permeable landscape swales, to infiltrate and stop sediment from being discharged as much as possible from the site.
Recent Comments