North Las Vegas, Nevada. Ms. Brown was responsible for the preparation of the technical drainage study for this 150-acre solar field site incorporating large quantities of photovoltaic (PV) panels. The drainage design for the site included a large rip-rap lined channel that is included in the Clark County Regional Flood Control District (CCRFCD) Master Plan, conveying over 1200 cfs in the 100-year storm event. The outlet of the channel was designed and implemented with gabion-lined drop structures and a reinforced concrete box culvert (RCB).
2010 – Technical Drainage Study for Renewable Ventures (Fotowatio Power) Solar Energy Project at Mountain View Industrial Park
by admin | Sep 16, 2020 | Projects | 0 comments
Recent Comments