Ms. Brown served as project engineer and was responsible for hydraulic analysis and design of a bridge crossing of a major arterial urban roadway to convey 11,500 cfs. The design included preparation of design drawings and specifications. The project included relocation of a 10″ water main and a 15″ sewer, structural design of the bridge and approach slabs, and inlet and outlet slope paving.