by admin | Sep 16, 2020 | Projects
Ms. Brown was responsible for performing a complete hydrologic and hydraulic analysis for the project. Included in the predesign was a development of alternatives including cost analysis for conveyance of approximately 4000 cfs of flood flow through the project...
by admin | Sep 16, 2020 | Projects
Ms. Brown served as project engineer and was responsible for preparing design drawings and specifications for this project which was located in a very urbanized area. The project included installation of large, precast concrete box culverts in a very restricted area...
by admin | Sep 16, 2020 | Projects
Ms. Brown was responsible for performing a complete hydrologic study for the project, which has a watershed of approximately 30 square miles. Ms. Brown was also responsible for hydraulic computer modelling of the existing system, and for alternative development for...
Recent Comments