2002 – Southern Highlands Parcel 201 (Toscana Vineyards)

Ms. Brown was responsible for preparation of the Technical Drainage Study and drainage design drawings for the development, which was located on a site impacted with alluvial fan flow of approximately 3600 cfs.  Design included a large rip rap-lined channel with drop...

2001 – Terracina Master Drainage Study

Ms. Brown was responsible for preparation of the Master Drainage Study and drainage design drawings for the site, which included an onsite basin of over 450 acres, varying in land usage from commercial to multi- and single-family residential. Design included a storm...

1995 – Eastern Avenue/Duck Creek Bridge

Ms. Brown served as project engineer and was responsible for hydraulic analysis and design of a bridge crossing of a major arterial urban roadway to convey 11,500 cfs. The design included preparation of design drawings and specifications. The project included...